32 Amp Three Phase Cable
32 Amp Three Phase Cable
The 32 Amp Three Phase cable (400V) extension lead is fitted with a 32a 5 pin IP54 ceeform connector at each end.
Experience superior performance with our double-insulated, flexible EPR cable. Designed for extreme environments, it offers exceptional resistance to weather, oils, greases, and demanding mechanical and thermal stresses, protecting your operations.
Conforms to BS EN 7919.
You may also like…
-

20kVA Silent Generator – Denyo Eventa – Trailer Mounted
£190.00Per Week
Hire Product -

63A Distro MD63
£60.00Per Week
Hire Product -

32 Amp Single Phase Cable
£1.80 – £13.38Per Week
Hire Product This product has multiple variants. The options may be chosen on the product page -

5 Channel DDA Cable Ramp
£15.00Per Week
Hire Product -

32A IMST-6
£15.00Per Week
Hire Product -

63 Amp Three Phase Cable
£5.38 – £17.22Per Week
Hire Product This product has multiple variants. The options may be chosen on the product page
| Weight | N/A |
|---|---|
| Length | 40m, 5m, 10m, 20m |
| Cable Rating | 32a |
| CSA | 6mm2 |
| Cable type | H07RN-F |
| Incoming Connector | 32a 5 pin ceeform |
| Outgoing Connector | 32a 5 pin ceeform |
£2.43 – £9.52
Per Unit Per weekHave a question about this product?
call us now on: 01282 500855
While everyone marvelled at the colours and installations at `Lightport` created by Lucid Creates, our generators and cabling quietly powered the magic behind the scenes across the 400 metre trail in Southport.
And we’re not done yet, we’ll also be powering the Cristal Palace event in Southport on 3rd & 4th April ⚡
Merry Christmas from Nick and the team here at Location Power ⚡
Thank you for supporting us this year, we can`t wait to keep powering the nation next year!
#PoweringEvents #LocationPower
We couldn’t let Light Night Wigan pass without showing you the lights in action 🤩
#locationpower #temporarypower #eventpower
Three years. Big improvements. A greener Light Night Wigan.
Find out how we did it - https://www.locationpower.co.uk/2025/12/08/three-years-of-sustainable-power-at-light-night-wigan/
The highlight of a miserable wet day in Wigan 🌈
#lightnightwigan #mesnesparkwigan #locationpower #generatorhire #hybridgenerator #moody



