100kVA Generator Trailer Mounted – Atlas Copco QAS5 100
100kVA Generator Trailer Mounted – Atlas Copco QAS5 100
The Atlas Copco QAS5 100 Stage 3a, a 100kVA Generator trailer mounted unit, provides a reliable and sustainable power solution, offering efficient operation, a reduced carbon footprint, and supporting your company’s environmental objectives. Its 8M0kW output and 400V/3Ph/50Hz compatibility make it versatile for various applications.
The twin-axle trailer ensures stability and ease of transport for temporary power needs.
Key features of the 100kVA Generator Trailer Mounted, Atlas Copco QAS5 100 Stage 3a:
– Reliable 80kW power output suitable for diverse applications
– Sustainable Stage 3a compliant design for lower operational costs and reduced environmental impact
– 400V/3Ph/50Hz voltage for wide equipment compatibility
– Stable and easily transportable twin-axle trailer mounting
– Compact dimensions and light weight for simplified setup and relocation
– Ideal for all temporary power solutions.
You may also like…
-

125 Amp Three Phase Cable
£16.53 – £25.54Per Week
Hire Product This product has multiple variants. The options may be chosen on the product page -

63A Distro MD63
£60.00Per Week
Hire Product -

125A Distro MD32
£70.00Per Week
Hire Product -

63 Amp Three Phase Cable
£5.38 – £17.22Per Week
Hire Product This product has multiple variants. The options may be chosen on the product page
| Weight | 2999 kg |
|---|---|
| External Tank Connectors | Y |
| Fuel Tank Capacity | 400 |
| Fuel Usage at 100% | 22lph |
| Noise Level at 7m (db) | 67 |
| Socket Types | 1 x 400v 125amp, 1 x 400v 63amp, 2 x 400v 32amp |
| Base | Trailer Mounted |
| Voltage [V/Ph/Hz] | 230/400/3/50 |
| Emissions Class | 3a |
£350.00
Per Unit Per weekHave a question about this product?
call us now on: 01282 500855
While everyone marvelled at the colours and installations at `Lightport` created by Lucid Creates, our generators and cabling quietly powered the magic behind the scenes across the 400 metre trail in Southport.
And we’re not done yet, we’ll also be powering the Cristal Palace event in Southport on 3rd & 4th April ⚡
Merry Christmas from Nick and the team here at Location Power ⚡
Thank you for supporting us this year, we can`t wait to keep powering the nation next year!
#PoweringEvents #LocationPower
We couldn’t let Light Night Wigan pass without showing you the lights in action 🤩
#locationpower #temporarypower #eventpower
Three years. Big improvements. A greener Light Night Wigan.
Find out how we did it - https://www.locationpower.co.uk/2025/12/08/three-years-of-sustainable-power-at-light-night-wigan/
The highlight of a miserable wet day in Wigan 🌈
#lightnightwigan #mesnesparkwigan #locationpower #generatorhire #hybridgenerator #moody





