100kVA Generator – Atlas Copco QAS5 100 – Skid mounted
100kVA Generator – Atlas Copco QAS5 100 – Skid mounted
The 100kVA generator QAS5 100 Stage 3a delivers a robust power of 80Kw. This generator is an optimal choice for hirers seeking a balance between size and performance.
Its 400V/3Ph/50Hz voltage ensures compatibility in various applications.
Standard features of the QAS5 100 Stage 3a:
– Robust 80kW power output for versatile applications
– Sustainable Stage 3a compliant design with lower operational costs and reduced carbon footprint
– 400V/3Ph/50Hz voltage compatibility for diverse power needs
– Stable and durable skid frame construction
– Compact dimensions and light weight for simplified transport and installation
– Ideal balance of size and performance for rental applications
You may also like…
-

63A Distro MD63
£60.00Per Week
Hire Product -

63 Amp Three Phase Cable
£5.38 – £17.22Per Week
Hire Product This product has multiple variants. The options may be chosen on the product page -

125A Distro MD32
£70.00Per Week
Hire Product -

125 Amp Three Phase Cable
£16.53 – £25.54Per Week
Hire Product This product has multiple variants. The options may be chosen on the product page
| Weight | 2999 kg |
|---|---|
| Dimensions | 285 × 110 × 162 cm |
| External Tank Connectors | Y |
| Fuel Tank Capacity | 400 |
| Fuel Usage at 100% | 22lph |
| Noise Level at 7m (db) | 67 |
| Socket Types | 1 x 400v 125amp, 1 x 400v 63amp, 2 x 400v 32amp |
| Base | Skid Mounted |
| Voltage [V/Ph/Hz] | 230/400/3/50 |
| Emissions Class | 3a |
£350.00
Per Unit Per weekHave a question about this product?
call us now on: 01282 500855
While everyone marvelled at the colours and installations at `Lightport` created by Lucid Creates, our generators and cabling quietly powered the magic behind the scenes across the 400 metre trail in Southport.
And we’re not done yet, we’ll also be powering the Cristal Palace event in Southport on 3rd & 4th April ⚡
Merry Christmas from Nick and the team here at Location Power ⚡
Thank you for supporting us this year, we can`t wait to keep powering the nation next year!
#PoweringEvents #LocationPower
We couldn’t let Light Night Wigan pass without showing you the lights in action 🤩
#locationpower #temporarypower #eventpower
Three years. Big improvements. A greener Light Night Wigan.
Find out how we did it - https://www.locationpower.co.uk/2025/12/08/three-years-of-sustainable-power-at-light-night-wigan/
The highlight of a miserable wet day in Wigan 🌈
#lightnightwigan #mesnesparkwigan #locationpower #generatorhire #hybridgenerator #moody





